Architecture Office

01

Project Program

The first stage to developing your new home is understanding the project requirements and prepare a detailed list of the needs and wants of our clients. Timeline for this phase is 1 week.

 

02

Feasibility Study and Research

Once we have acquired the long list of dreams from our clients, our team must ensure that the proposal is feasible from a building code and municipal by-law perspective. Timeline for this phase 2 weeks.

 
 

03

Design Development

Using the notes from our initial meeting and the notes prepared for the zoning review analysis, our team will put together a design concept that will be presented to you in the initial design presentation meeting. Timeline for this phase is 6-8 weeks.

 

04

Construction Documentation

The design has been finalized and approved by the client.The next step is to prepare and coordinate the construction documentation required for building permit submission and pricing. Timeline for this phase 8-12 Weeks.

 
 
Architecture Team
Architecture Team

03

Design Development

Using the notes from our initial meeting and the notes prepared for the zoning review analysis, our team will put together a design concept that will be presented to you in the initial design presentation meeting. Timeline for this phase is 6-8 weeks.

 

04

Construction Documentation

The design has been finalized and approved by the client.The next step is to prepare and coordinate the construction documentation required for building permit submission and pricing. Timeline for this phase 8-12 Weeks.

 
 
Architecture Operations

05

Permit Submission

After diligently coordinating all aspects of the project, our team will prepare and submit the building permit application to the respective municipality. Timeline for this phase is 8 to 12 weeks.

 

06

Construction

The building permit has been issued and you are ready to proceed with the construction of your new home. The next step is to coordinate with the contractor and assist with the smooth execution of your uniquely designed residence. Timeline for this phase is 52 to 104 weeks.

 
 

Sustainable Modern Architecture Transformation

Architectural Strategies for Sustainability:

01

Roof Redesign.

 

02

Sustainable Envelope & Materials.

 

03

Passive Design & Natural Light.

 
 

04

Water Management & Regenerative Landscaping.

 

05

High-Efficiency Systems.

 

06

Low-Carbon Construction Approach.

 
 

04

Water Management & Regenerative Landscaping.

 

05

High-Efficiency Systems.

 

06

Low-Carbon Construction Approach.